翻訳と辞書
Words near each other
・ Dingleberry Haze
・ Dingleberry Lake
・ Dingleden
・ Dingler
・ Dingler, Alabama
・ Dingles (department store)
・ Dingleton
・ Dingleton Hill Covered Bridge
・ Dinglewood
・ Dinglewood House (Columbus, Georgia)
・ Dinglewood, Columbus, Georgia
・ Dingley
・ Dingley (surname)
・ Dingley Act
・ Dingley Act (shipping)
Dingley Arterial Project
・ Dingley Askham
・ Dingley Askham Brittin
・ Dingley Building
・ Dingley Football Club
・ Dingley Island
・ Dingley Stars FC
・ Dingley Village, Victoria
・ Dingley, Northamptonshire
・ Dingleya
・ Dingli
・ Dingli Swallows F.C.
・ Dingling
・ Dinglishna Hill
・ Dinglishna Hills, Alaska


Dictionary Lists
翻訳と辞書 辞書検索 [ 開発暫定版 ]
スポンサード リンク

Dingley Arterial Project : ウィキペディア英語版
Dingley Arterial Project

The Dingley Arterial Road Project (in the Dingley Freeway reserve) is a partially completed arterial standard road which runs east to west through the southern suburbs of Melbourne, Australia.
Although the road was designed to be a freeway for the full length of the planned 19 kilometre route, it has been instead constructed as bypasses for the Melbourne suburbs of Mordialloc, Springvale, and Dandenong over the years.
==Intended Course==

Starting at the intersection of Warrigal Road and South Road in Moorabbin, the route travels east, crossing Old Dandenong Road, Clarinda Road, Kingston Road and Boundary Road before intersecting with the proposed northern extension of the Mornington Peninsula Freeway. It then interchanges with Westall Road as the route starts to travel in a south easterly direction. The route then crosses Springvale Road, Cheltenham Road, Chapel Road, Stanley Road, Perry Road and Chandler Road before approaching a diamond interchange with the EastLink tollway. The route then continues east crossing Hammond Road, Dandenong - Frankston Road and the South Gippsland Highway before finishing with a fully grade separated T interchange with the South Gippsland Freeway in Dandenong South.
The freeway was originally designated in the 1969 Melbourne Transportation Plan as part of the F2 Freeway corridor. The original plan shows the freeway extending down South Road over Nepean Highway heading north through Brighton and Elwood, following the Barkly Street-Punt Road-Hoddle Street corridor up through Merri Creek joining the Craigieburn Bypass to the Hume Freeway.

抄文引用元・出典: フリー百科事典『 ウィキペディア(Wikipedia)
ウィキペディアで「Dingley Arterial Project」の詳細全文を読む



スポンサード リンク
翻訳と辞書 : 翻訳のためのインターネットリソース

Copyright(C) kotoba.ne.jp 1997-2016. All Rights Reserved.